Multnomah County Morrison Street: Willamette River (Morrison) Bridge Main Spans Paint Project
PROJECT DESCRIPTION
This contract provides for the painting of the Morrison Street Bridge in Portland, OR including; paint below-deck steel on 5 river spans, repair structural steel in truss spans and repair gutter system at lift span, replace FRP sidewalks on lift span and sign replacement.