SR-409 Columbia River Bridge at Puget Island – Painting and Deck Replacement

0 student
section-6f130f9

Project Description

Advanced Government Services was subcontracted by Royal Bridge to conduct full service traffic control for the SR 409 Columbia River Bridge project in Cathlamet, WA. The goal of the project is repainting of the bridge and replacement of the bridge deck. AGS has provided flagging services as well as portable signal deployment with 24/7 TCS coverage.

Resources

  • 24hr TCS coverage
  • Class A Signage
  • ADA Shuttle
  • Portable traffic signals

Project Images

Client

Royal Bridge Inc.

Duration

Mar. 2018 - Present

Scope Of Work

Flagging, Class A signage, ADA compliant shuttle service, portable traffic signal.

Curriculum is empty
User Avatar

0.00 average based on 0 ratings

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
5798USD