US 12 Naches River Bridge Painting 

PROJECT DESCRIPTION

Advanced Government Services was subcontracted by Liberty Maintenance Inc to provide traffic control for the US 12 Naches River Painting project in Yakima, WA. The scope of the project was cleaning and repainting of the Naches River Bridge. AGS provided lane closures with TMA coverage and detour to assist in the setup and teardown of the work zone.

PROJECT IMAGES

CONTACT US

"*" indicates required fields